Job completed for Andrea A.
Completion date: October 17, 2016
Location: Greenfield, IN
Solutions provided:
Our team installed 180 linear feet of the AmeriDrain perimeter drainage system connected to a new AmeriSump pump station for reliable water removal. We also added five downspout extensions to direct roof runoff away from the home’s foundation. Inside the crawl space, 1,900 square feet of 6 Mil vapor barrier was laid to control ground moisture, while Timbor Spray was applied to all exposed wood surfaces for mold and pest prevention. For structural reinforcement, we installed 15 box header caps and replaced 15 square feet of subfloor support to strengthen weakened areas.
Team members on this project:
Brian