Completed Jobs by Americrawl
June 11, 2019 | Bloomington, IN
To address the water management issue, Americrawl installed the AmeriDrain® interior drainage system along the crawl space perimeter. This system efficiently channels groundwater to the newly installed SuperSump® sump pump station, a high-performance unit designed to handle large volumes of water and discharge it safely away from the home. For ...
May 6, 2019 | Franklin, IN
This project involved addressing a sinking patio corner by installing two Dyna Push Piers. Over time, soil settlement beneath the concrete had caused the corner to drop, creating uneven surfaces and potential structural stress. Our team installed the Dyna Push Piers beneath the affected section to stabilize and lift the ...
March 22, 2019 | St. Paul, IN
Americrawl crew i nstalled 65 linear feet of the AkwaGuard Drainage System along the basement perimeter to capture and redirect water seepage effectively. Sump Pump Installation: Installed 1 SuperSump Sump Pump Station to provide dependable water evacuation and protect the basement from water accumulation. Backup Protection: Added 1 UltraSump Battery Backup System to ...
March 5, 2019 | Fishers, IN
This project included a comprehensive crawl space improvement plan to address water intrusion, moisture control, and accessibility. Our team installed 65 linear feet of AmeriDrain Drainage System to effectively channel groundwater and prevent water accumulation within the crawl space. This high-performance drainage system ensures long-term protection against moisture damage and helps ...
February 13, 2019 | Morgantown, IN
To restore the structure, Americrawl’s skilled technicians began by carefully removing the damaged center beam and replacing it with a new, treated lumber beam designed to resist future moisture and insect damage. This new beam provided immediate support to the home’s floor system, correcting much of the sagging. ...
January 14, 2019 | Indianapolis, IN
For this project, our team focused on improving the crawl space environment through moisture control and accessibility. We installed 865 square feet of CleanSpace encapsulation system, a highly durable liner designed to create a complete vapor barrier across the floor and walls. This system effectively reduces humidity, helps prevent mold growth, ...
January 14, 2019 | Peru, IN
This project began with a 950-square-foot crawlspace cleanout, where all debris and unsuitable material were removed to prepare the area for proper protection. Once cleaned, we installed 950 square feet of the CleanSpace encapsulation system, that seals the crawlspace from ground moisture and improves overall home air quality. To further control ...
December 27, 2018 | Indianapolis, IN
Our experienced crew installed a job that includes multiple structural repairs and reinforcements to restore proper support and stability to the home’s floor system. An 18-foot section of the center beam is replaced, along with an additional 13-foot center beam replacement, to address compromised or deteriorated structural members. Nine ...
October 12, 2018 | Carmel, IN
The scope of work includes professional mold remediation across approximately 2,000 square feet of crawlspace area, addressing existing microbial growth on affected surfaces to help restore a healthier environment. All visible mold is treated and removed in accordance with proper remediation practices to reduce the risk of future growth. Following the ...
September 19, 2018 | Kokomo, IN
Americrawl completed a series of structural wood repairs to reinforce and stabilize the home’s crawl space framing system. The project included the replacement of 10 feet of rim joist and plate and 23 feet of sill plate due to signs of deterioration and moisture damage. Additionally, technicians installed 8 sister joists to ...
September 7, 2018 | Greenfield, IN
The project includes the installation of one AmeriSump sump station to improve water management and protect the foundation. A 560-square-foot area will be covered with a 6-mil black vapor barrier to reduce moisture intrusion. Structural work involves replacing 28 feet of the existing 2×8 center beam and installing nine full-length 2×8 floor joists ...
Total: 654

