Serving Indiana Since 1993

Job completed for Ryan B

Completion date: October 24, 2016

Location: Coatsville, IN

Solutions provided:

The installation team completed the installation of two SmartJack adjustable support posts beneath the existing center beam to address settlement and restore proper structural support. The center beam had experienced downward movement due to inadequate support, resulting in floor deflection and reduced load-bearing performance.

Each SmartJack was installed on a properly prepared engineered base and precisely adjusted to transfer structural loads to stable bearing material below. The support posts were positioned beneath the center beam to help lift and stabilize the affected area, improve load distribution, and reduce excessive floor movement. This reinforcement system provides a durable, long-term solution designed to prevent further settlement and enhance the overall stability and performance of the floor framing system.

Team members on this project:

Brian

Photos & Videos:

Smart Jacks
Large View Icon
Smart Jacks