Solutions provided:
This project included extensive structural wood repair throughout the crawlspace. The crew installed 32 feet of new rim joist and plate, along with 36 feet of sill plate replacement to restore proper load-bearing support along the perimeter. In addition, 36 feet of center beam replacement was completed to stabilize the main structural span of the home.
The repair scope also included the installation of 54 full-length floor joists to replace damaged or weakened framing members and provide complete structural reinforcement. Areas of damaged or deteriorated subfloor were removed and new subflooring was installed to restore stability above.
To properly support the new center beam, the team installed three poured concrete pads, creating a solid resting base for long-term structural integrity.