Job completed for Michael A
Completion date: September 15, 2004
Location: Indianapolis, IN
Solutions provided:
his project focused on addressing significant structural and moisture-related concerns within the crawl space. The following work was completed: 25 feet of rim joists and plate replacement to restore structural integrity where wood had deteriorated or weakened. 10 feet of sill plate replacement to ensure a strong connection between the foundation and the floor system. 4 reinforced 2x8 sister joists installed to strengthen compromised joists and restore proper load-bearing capacity. 2 full-length 2x8 floor joists replaced for added stability in critical areas. 1,286 square feet of Tim-bor® treatment applied to all exposed wood surfaces, protecting against future mold, rot, and insect damage.