Serving Indiana Since 1993

Job completed for Jesse B

Completion date: March 4, 2002

Location: Indianapolis, IN

Solutions provided:

The installation team completed structural framing repairs to restore stability and proper load distribution within the affected area. The work included replacement of 42 linear feet of deteriorated sill plate with new 2x4 material to reestablish a solid connection between the framing and foundation. In addition, twelve (12) 2x10 sister joists were installed alongside existing floor joists to reinforce weakened members and improve overall strength and stiffness of the floor system. Each sister joist was properly fastened and aligned to ensure effective load sharing and long-term performance. These repairs enhance structural integrity, reduce deflection, and provide a more stable and reliable framing system.

Team members on this project:

Mark Ralph

Photos & Videos:

Structural Wood Repair
Large View Icon
Structural Wood Repair