Job completed for Adam&Lori B.
Completion date: November 22, 2021
Location: Edinburgh, IN
Solutions provided:
The scope of work includes the installation of one steel crawlspace access door to provide secure and long-lasting entry to the crawlspace. In addition, eight poured concrete pads are installed beneath the center beam of the home to create stable and properly engineered bearing points. An 18-foot section of the center beam is then replaced and set on the new concrete pads, restoring proper structural support to the floor system. This work corrects existing deficiencies, improves load distribution, and enhances the overall structural stability and integrity of the home.
Team members on this project:
Kevin, Tyler

