Job completed for Kathleen A.
Completion date: February 27, 2024
Location: Indianapolis, IN
Solutions provided:
Our team completed a structural repair project to restore stability and integrity to the floor system. The work included the installation of eleven (11) full-length 2” x 8” x 12’ floor joists, providing essential reinforcement to weakened or compromised framing. To further strengthen load-bearing points, we installed five (5) box header caps, ensuring proper distribution of structural loads across critical areas.
For additional support under key sections of the floor, we installed an 8-foot steel I-beam, offering long-lasting strength and stability. This beam was paired with two (2) adjustable SmartJacks, which provide precise height adjustment and support to correct sagging floors and prevent future settlement.
Team members on this project:
Brian, Carter