Job completed for Jim A.
Completion date: April 29, 2014
Location: Indianapolis, IN
Solutions provided:
For this project, we installed 1 Helical Piers to provide structural stabilization and permanent support to the foundation in critical load-bearing areas. Each pier was designed to reach load-bearing soil, ensuring that the foundation remains secure and resistant to settlement.
Additionally, we performed two lintel footing pours, each measuring 2 feet by 4 feet in length and width. These lintel footings were strategically installed to reinforce the structural integrity of the foundation where necessary, providing extra stability for areas with compromised support.
Team members on this project:
Daniel