Job completed for Michael
Completion date: November 28, 2017
Location: Greenfield, IN
Why did the customer contact us?
Solutions provided:
- 20-foot sill plate
- 6-foot 4-inch steel beam
- 15 sister joists, each 4 feet 7 inches long
- 2 SmartJacks
Michael agreed to the foundation repair costs and scheduled the work to be completed.
The installation team, led by Foreman Celeo, arrived and installed the two SmartJacks along with 6 feet of the 4-inch steel beam. The SmartJacks and steel beam successfully lifted the sagging floors. With the replaced sill plate and sister joists in place, the floors are now stabilized.
Team members on this project:
Celeo, Mark J